![East of the school, door and window frames wait for installation. Glass board covers the two-story portion adjacent to the academic wing. East of the school, door and window frames wait for installation. Glass board covers the two-story portion adjacent to the academic wing.](/documents/download/?id=14281&forcedownload=0&thumbnail=1) |
East of the school, door and window frames wait for installation. Glass board covers the two-story portion adjacent to the academic wing. |
|
|
![The driveway leading toward the middle school’s main entrance has been paved. Roof joists have been installed for the media center. The driveway leading toward the middle school’s main entrance has been paved. Roof joists have been installed for the media center.](/documents/download/?id=14279&forcedownload=0&thumbnail=1) |
The driveway leading toward the middle school’s main entrance has been paved. Roof joists have been installed for the media center. |
|
|
![Crews pave 12th Avenue South on the north side of the school. Crews pave 12th Avenue South on the north side of the school.](/documents/download/?id=14282&forcedownload=0&thumbnail=1) |
Crews pave 12th Avenue South on the north side of the school. |
|
|
![The south side of the media center is partially enclosed. The south side of the media center is partially enclosed.](/documents/download/?id=14280&forcedownload=0&thumbnail=1) |
The south side of the media center is partially enclosed. |
| |
|