![Ken Cote, Kraus Anderson site supervisor, shows the blueprints of the middle school to Minnesota Education Commissioner Cheri Pierson Yecke, who toured the construction Sept. 16. Ken Cote, Kraus Anderson site supervisor, shows the blueprints of the middle school to Minnesota Education Commissioner Cheri Pierson Yecke, who toured the construction Sept. 16.](/documents/download/?id=14273&forcedownload=0&thumbnail=1) |
Ken Cote, Kraus Anderson site supervisor, shows the blueprints of the middle school to Minnesota Education Commissioner Cheri Pierson Yecke, who toured the construction Sept. 16. |
|
|
![Structural steel has been erected for the media center. Structural steel has been erected for the media center.](/documents/download/?id=14276&forcedownload=0&thumbnail=1) |
Structural steel has been erected for the media center. |
|
|
![Looking to the south, the foundation and structural steel for the music classrooms and cafetorium can be seen. Looking to the south, the foundation and structural steel for the music classrooms and cafetorium can be seen.](/documents/download/?id=14277&forcedownload=0&thumbnail=1) |
Looking to the south, the foundation and structural steel for the music classrooms and cafetorium can be seen. |
|
|
![Driveways near the main entrance of the school are being prepared for paving. Structural steel has been erected for the framework of the cafetorium and music classrooms. Driveways near the main entrance of the school are being prepared for paving. Structural steel has been erected for the framework of the cafetorium and music classrooms.](/documents/download/?id=14278&forcedownload=0&thumbnail=1) |
Driveways near the main entrance of the school are being prepared for paving. Structural steel has been erected for the framework of the cafetorium and music classrooms. |
|
|
![Curbs have been poured for roads and parking areas on the south side of the middle school. Curbs have been poured for roads and parking areas on the south side of the middle school.](/documents/download/?id=14275&forcedownload=0&thumbnail=1) |
Curbs have been poured for roads and parking areas on the south side of the middle school. |
|
|
![Walls for classrooms in the three-story academic wing are being sheetrocked. Walls for classrooms in the three-story academic wing are being sheetrocked.](/documents/download/?id=14274&forcedownload=0&thumbnail=1) |
Walls for classrooms in the three-story academic wing are being sheetrocked. |
| |
|