|
Ceiling, wall and floor surfaces are nearly complete in this second floor “house” in the three-story academic wing at Horizon Middle School. Each house has five classrooms for core subjects (math, language arts, science, social studies and reading) surrounding a shared resource space. |
|
|
|
Wood flooring and basketball hoops have been installed in the gymnasium. |
|
|
|
Lockers are in place in this locker room across from the gymnasium. Ceiling tiles still need to be installed. |
|
|
|
Looking down into the library media center, the windows on the east and south sides of the space are still covered from the inside to protect them from paint spatter. |
|
|
|
Workers prepare the hallway in front of the main office for flooring to be installed. |
|
|
|
Door frames are in place for the media center’s entrance. |
|
|
|
Next to the main office is the cafetorium where scaffolding fills the room. |
|
|
|
Windows have been installed in the two-story library media center. Work continues on the exterior of the music classrooms to the south. |
| |
|