![The glass board on the two-story portion adjacent to the academic wing is being covered. Door and window frames are ready for installation on the east side of the school. The glass board on the two-story portion adjacent to the academic wing is being covered. Door and window frames are ready for installation on the east side of the school.](/documents/download/?id=14270&forcedownload=0&thumbnail=1) |
The glass board on the two-story portion adjacent to the academic wing is being covered. Door and window frames are ready for installation on the east side of the school. |
|
|
![The roof of the three-story wing is mostly complete, and workers continue to install roof panels on the adjacent section of the school. The roof of the three-story wing is mostly complete, and workers continue to install roof panels on the adjacent section of the school.](/documents/download/?id=14271&forcedownload=0&thumbnail=1) |
The roof of the three-story wing is mostly complete, and workers continue to install roof panels on the adjacent section of the school. |
|
|
![Construction workers build a masonry wall on the south side of the middle school near the cafetorium. Construction workers build a masonry wall on the south side of the middle school near the cafetorium.](/documents/download/?id=14269&forcedownload=0&thumbnail=1) |
Construction workers build a masonry wall on the south side of the middle school near the cafetorium. |
|
|
![The roof joists are in place for the space near the gymnasium where the weight room and locker rooms will be located. The roof joists are in place for the space near the gymnasium where the weight room and locker rooms will be located.](/documents/download/?id=14272&forcedownload=0&thumbnail=1) |
The roof joists are in place for the space near the gymnasium where the weight room and locker rooms will be located. |
| |
![Metal stud framing is being completed on the south side of the media center, and windows are being framed on the south side of the three-story academic wing. Metal stud framing is being completed on the south side of the media center, and windows are being framed on the south side of the three-story academic wing.](/documents/download/?id=14268&forcedownload=0&thumbnail=1) |
Metal stud framing is being completed on the south side of the media center, and windows are being framed on the south side of the three-story academic wing. |
|
| | |
|