|
By Aug. 7, much of the north side of the academic wing has been enclosed by glass dens board. |
|
|
|
Precast concrete planks have been installed to create the floor of the media center. |
|
|
|
Masonry walls for the gymnasium are under construction. |
|
|
|
On the third floor in the academic wing, the concrete floor is smoothed. |
|
|
|
On the north side of the middle school, the metal stud framing is being covered with yellow dens board. |
|
|
|
Metal studs frame future classroom walls. |
| |
|
Construction workers erect masonry walls. |
|
| | |
|