Concrete was poured in mid December for the foundation walls on the south side of the new middle school’s three-story academic wing. Also in December, the School Board awarded Bid Package 2 for precast concrete and structural steel for the new middle school. |
|
|
|
Concrete foundation wall remains after the concrete forms are stripped. |
|
|
|
The concrete truck backs up to pour concrete for the middle school’s foundation walls. |
|
|
|
Warmer weather in mid December made it easier for construction to continue at the middle school site. The construction company’s ground thaw machine is at the site to warm soil on the outside of the foundation walls. |
|
|
|
The panel from the concrete form is attached to a forklift for removal. |
|
|
|
The forklift removes the panel from the foundation wall. |
| |
|