|
Work continues on the lower level of the media center. The fiction books and the literature books will be housed on this level. |
|
|
|
The flooring is being installed for the fieldhouse at Moorhead High. |
|
|
|
The circulation desk for the lower level of the high school media center has been installed. |
|
|
|
The curtain system attached to the ceiling allows the fieldhouse to be sectioned off into several areas. A track will circle the perimeter of the fieldhouse with basketball courts in the center area. |
| |
|
The new commons at Moorhead High School opened for student use at the beginning of second semester. Work on the new serving areas by the kitchen will be completed this summer. |
|
| | |
|